制造能源用英文怎么说(制造业常用英语大全,超实用,建议收藏起来备用哦)
一、职能部门
总经理办公室General manager’s office
模具部Tooling department
项目部Project department
品质部Quality department
计划部Plan department
制造部Manufacture department
Keypad产品部Keypad department
IMD产品部IMD department
五金部 Hardware Department
金屬衝壓部門 Metal stamping department
设计科Design section
冲压车间Stamping workshop
电镀车间Plating workshop
物控科Production material control section
计划科Plan section
仓务科Warehouse section
商务科Business section
品质规划科quality plan section
IQC科IQC section IQC:Incoming Quality Control,意思为来料质量控制
IPQC科IPQC section In Process Quality Control.在制过程质量控制
OQC科OQC section
检测中心measurement center
项目规划科Project plan section
项目XX科Project section XX
试模科Mold test section
成本科Cost section
设备科Facility section
采购科Purchase section
综合办General affair’s office
编程科Programming section
模具工程科Tooling engineering section
模具装配车间Mold assembly workshop
文控中心Document control center(DCC)
注塑车间Injection workshop
喷涂车间Spray painting workshop
装配车间Assembly workshop
总经理General manager(GM)
经理manager
XX部门经理Manager of XX department
原料库Raw material warehouse
半成品库Semi-finished product warehouse
成品库Finished product warehouse
科长section chief
主任chief
部门主管department head
主管,线长supervisor
组长Foreman ,fore lady
秘书secretary
文员clerk
操作员operator
助理assistant
职员staff
二、产品
超声波焊接ultrasonic welding
塑胶件Plastic parts
塑材Raw parts
喷涂件Paint departs
装配件Assembly parts
零件Component
原料Raw material
油漆Paint
稀释剂Thinner
油墨Ink
物料编号part number
三、模具
注塑模具injection mold
冲压模具Stamping tool
模架mold base
定模座板Fixed clamp plate
A板A plate
B板B plate
支承板support plate
方铁spacer plate
回位销Return pin
导柱Guide pin
动模座板Moving clamp plate
顶针ejector pin
单腔模具single cavity mold
多腔模具multi-cavity mold
浇口gate
合模力clamping force
锁模力locking force
开裂crack
循环时间cycle time
老化aging
(1)螺杆screw
镶件Insert
主流道sprue
分流道runner
浇口gate
直浇口direct gate
点浇口pin-point gate
测浇口edge gate
潜伏浇口submarine gate
浇口套sprue bush
流道板runner plate
排气槽vent
分型线(面)parting line
定模Fixed mold
动模movable mold
型腔cavity
凹模cavity plate,
凸模core plate
斜销angle pin
滑块slide
拉料杆sprue puller
定位环locating ring
脱模斜度draft
滑动型芯slide core
螺纹型芯threaded core
热流道模具hot-runner mold
熔合纹weld line
三板式模具three plate mold
脱模ejection
脱模剂release agent
注射能力shot capacity
注射速率injection rate
注射压力injection pressure
保压时间holding time
闭模时间closing time
电加工设备Electron Discharge Machining
数控加工中心CNC machine center
万能铁床Universal milling machine
平面磨床Surface grinding machine
万能摇臂钻床Universal radial movable driller
立式钻床Vertical driller
倒角chamfer
键Key
键槽key way
间距pitch
快速成型模Rapid prototype tool(RPT)
四、品管
SPC統計程式控制 SPC statistic process control
品质保证Quality Assurance (QA)
品质控制Quality control (QC)
来料检验IQC ( Incoming quality control)
巡检IPQ (In-process quality control)
校对calibration
环境试验Environmental test
光泽gloss
拉伸强度tensile strength
盐雾实验salt spray test
翘曲warp
比重specific gravity
疲劳fatigue
撕裂强度tear strength
缩痕sink mark
耐久性durability
抽样sampling
样品数量sample size
AQL Acceptable Quality level
批量lot size
抽样计划sampling plan
抗张强度Tensile Strength
抗折强度Flexural Strength
硬度Rigidity
色差Color Difference
涂镀层厚度Coating Thickness
导电性能Electric Conductivity
粘度viscosity
附着力adhesion
耐磨Abrasion resistance
尺寸Dimension
(喷涂)外观问题Cosmetic issue
不合格品Non-conforming product
限度样板Limit sample
五、生产
注塑机injection machine
冲床Punch machine
嵌件注塑Insert molding
双色注塑Double injection molding
薄壁注塑Thin wall molding
膜内注塑IMD molding (In-mold decoration)
移印Tampo printing
丝印Silk screen printing
热熔Heat staking
(2)超声熔接Ultrasonic welding (USW)
尼龙nylon
黄铜brass
青铜bronze
紫(纯)铜copper
料斗hopper
麻点pit
配料compounding
涂层coating
飞边flash
缺料Short mold
烧焦Burn mark
缩水Sink mark
气泡Bubbles
破裂Crack
熔合线Welding line
流痕Flow mark
银条Silver streak
黑条Black streak
表面光泽不良Lusterless
表面剥离Pelling
翘曲变形Deformation
脏圬Stain mark
油污Oil mark
蓝黑点Blue-black mark
顶白Pin mark
拉伤Scratch
限度样品Limit sample
最佳样品Golden sample
预热preheating
再生料recycle material
机械手Robot
机器人Servo robot
试生产Trialrun ;Pilotrun(PR)
量产mass production
切料头Degate
产能Capacity
能力Capability
参数Parameter
二次加工Secondary process
六.物控
保质期shelf life
ABC分类法ABC Classification
装配Assembly
平均库存Average Inventory
批号Batch Number
批量生产Mass Production
提货单Bill of Lading
物料清单Bill of Material
采购员Buyer
检查点Check Point
有效日期Date Available
修改日期Date Changed
结束日期Date Closed
截止日期Date Due
生产日期Date in Produced
库存调整日期Date Inventory Adjust
作废日期Date Obsolete
收到日期Date Received
交付日期Date Released
需求日期Date Required
需求管理Demand Management
需求Demand
工程变更生效日期Engineering
Change Effect Date
呆滞材料分析Excess Material Analysis
完全跟踪Full Pegging
在制品库存In Process Inventory
投入/产出控制Input/Output Control
检验标识Inspection ID
库存周转率Inventory Carry Rate
准时制生产Just-in-time(JIT)
人工工时Labor Hour
最后运输日期Last Shipment
版权声明
本文仅代表作者观点,不代表本站立场。
本文系作者授权本站发表,未经许可,不得转载。